MOQ 50 pcsSample in 7 daysBulk production 15–25 days
Factory & quality

Reliable production starts with a controlled process

With 15 years of apparel manufacturing experience, our team manages each stage from pre-production review through final packing.

01

Pre-production review

Materials, measurements, artwork placement, construction and packing requirements are confirmed against the approved sample.

02

Material & cutting checks

Fabric and trims are checked before cutting. Markers and bundles are organized to support consistent assembly.

03

In-line inspection

Construction, measurements and workmanship are monitored during sewing so issues can be corrected early.

04

Finishing & final inspection

Garments are trimmed, pressed, measured and visually checked before they are folded and packed.

05

Packing & shipment preparation

Size ratios, labels, barcodes and carton markings are prepared according to the agreed packing instructions.

Transparent communication

Clear checkpoints from sample to shipment

We keep your team informed at the moments that matter: material confirmation, sample approval, bulk production and final packing.

Discuss your quality requirements →
Typical timeline7 daysSample development
15–25 daysBulk production after approval